ALL SILOS FITTED WITH |
|
![]() |
Ø114 Filling / Blow- in pipe with Stortz coupling |
![]() |
Ø165 Overflow / Breather pipe |
![]() |
Catladder & Safety guard from silo roof to outlet height |
![]() |
250mm Butterfly valve - Lever operated |
![]() |
Rest platform at heights required by law (from 9m high) |
![]() |
Spring-loaded pressure / vacuum relief valve |
OPTIONAL EXTRAS |
|
![]() |
Silo legs can be extended to clients required outlet height |
![]() |
Silos can be designed and manufactured to clients specifications |
![]() |
Silos can be painted to clients specific colour codes |
![]() |
Filtration systems |
![]() |
Aeration pads & piping kits |
SILOS EXCEEDING 3 METER IN DIAMETER |
|
![]() |
Mobile crane hire require for silo off-load |
![]() |
Abnormal transport permits required |
MODEL |
VOLUME |
HEIGHT |
RINGS |
DIAMETER |
POA |
|
IN-OUTLET |
OUTLET 1600 ABOVE GROUND LEVEL |
MM |
EXCL. VAT & DELIVERY |
|||
CEM25 | 21.37 | 5.500 | 7.100 | 2.5 | 2700 | |
CEM35 | 28.37 | 6.700 | 8.300 | 3.5 | 2700 | |
CEM45 | 35.37 | 7.900 | 9.500 | 4.5 | 2700 | |
CEM50 | 38.87 | 8.560 | 10.160 | 5 | 2700 | |
CEM55 | 42.37 | 9.160 | 10.760 | 5.5 | 2700 |
VOLUME |
CEMENT |
LIME |
HEIGHT |
RINGS |
DIAMETER |
POA |
M³ |
1.2 T / M³ |
800KG / M³ |
TOP RAIL TO OUTLET |
DIAMETER MM |
|
|
37 | 48 TON | 30 TON | 6.175 | 3 | 3250 | |
47.2 | 60 TON | 37 TON | 7.400 | 4 | 3250 | |
57.3 | 75 TON | 45 TON | 8.625 | 5 | 3250 | |
67.5 | 85 TON | 54 TON | 9.850 | 6 | 3250 | |
77.7 | 100 TON | 62 TON | 11.755 | 7 | 3250 | |
87.8 | 115 TON | 70 TON | 12.300 | 8 | 3250 | |
98 | 130 TON | 80 TON | 13.525 | 9 | 3250 | |
108 | 140 TON | 90 TON | 14.750 | 10 | 3250 | |
200 | 260 TON | 160 TON | 17.000 | 10 | 4400 |
CEMENT SILOS MANUFACTURED FOR |
|
![]() |
PPC Cement |
![]() |
Lafarge SA |
![]() |
AfriSam |
![]() |
Pronto Readymix plants & site placement |
![]() |
Bird Machines - mining sector |
![]() |
Murray & Roberts - mining |
FOUNDATION DRAWINGS AVAILABLE |
|
|
150 KPA soil barring capacity required. The client must have soil tested and should the soil barring capacity not conform to our requirements, the foundation will need to be re-designed.These costs will be for the clients account. |